I installed and sanded and I laid 1 coat of wood sealer and 2 coats pol. one of my favorites. This house is in Holden beach nc in the lakes of lockwood sub div.
I installed and sanded over 1/2 of the houses in the sub div. over the 2 year time- span of its build..