When finishing a basement, what order does the finishing start once you have your layout designed?
1 Comment
-
First you want to frame your walls, then plumbing, HVAC, electrical, insulation. Then inspections, hang drywall, trim and paint. I am guessing that you are putting in a drop ceiling, so that is next. Then tile, cabinates, fixtures and flooring.
