Our kitchen remodel...step by step

Leslie D
by Leslie D
Glue Lam Beams wrapped to make refrigerator built-in area.
Drywall Installed, and structural glue-lam beams installed
Ceiling Drywalled
Venetian Plaster Decorative Treatment Started
Finished Venetian Plaster Decorative Wall Complete. No room for art on this wall, soooo...
Cabinets getting ready for install
Island cabinets installed
Cabinets Installed
More Cabinets Installed
Insulation Installed
Double Wall Oven and Drawer Microwave Installed
Island Dishwashers Installed (we have now replaced 1 DW with a more useful mini fridge)
Hood Vent Installed
Fridge Installed
Finished Product
Finished Product
View From Island
Builder Grade Kitchen 9' x 9'
Island Wall Framed
New Plumbing for Detached Island
Plumbing complete and concrete repaired
Plumbing parts laid out for drain connection and chicago loop venting run
Digging to find the drain
A Detached Island Requires finding the drain and running venting back to wall. Also needed elect
Ceiling Striped so Can Lights and Insulation can go in
Doorway moved to where extra bank of cabinets used to be to expand kitchen area
Angled Wall Moved. Was Structural, but gained needed extra room
Striped to studs
Where extra bank of cabinets used to be
Walls stating to go.
Ceiling was boxed in, making it feel even smaller
2 layers of tile removed
Bank of extra cabinets on other side of doorway
Frequently asked questions
Have a question about this project?
Comments
Join the conversation
2 of 21 comments
  • Rachel Rachel on Oct 17, 2011
    Your new kitchen looks GREAT!
  • Bren Bren on Jul 06, 2014
    I can NOT hardly believe this happend. WOW oh WOW, what I wouldnt give for a double over with a "pull out mirco" did even know they exsisted!! Simply grand!! I want to redo my long galley kit, any idea's or plans for this you can direct me to please? OMG I cant quit looking at it, CAN YOU? I might have just slept in there the first night!
Next