Jack hammer concrete floor and tie new drain pipes into main drain and re-cement floor strap ceiling frame new walls install new lights GFI outlet new switces install new shower 4' shower stall install insulation sheetrock ceiling and walls tape and seam three coats paint ceiling walls and trim install 36" pocket door Install trim install new 4' vanity and top install new toilet install new flooring