This project was split up into two different phases due to the numerous improvements being done. In this first phase we did all the landscape, hardscape, replaced a single door with french doors that lead out to the patio and the front door was replaced.
This picture was taken after the french doors were installed.
Here is the after photo with everything completed.
Here is a closer look at the patio and the outside dining area. There is a build-in BBQ with large counters, perfect for outside entertaining and the view couldn't be better.
This view is from the front of the house.
This is the new front door, a small change can make a big difference.