7 Materials
$80000
6 Months
Advanced
This is part 2 of our Kitchen Transformation Project. Our Cabinets and Countertops are being installed and we are so excited to share it with you.
We still need our hardware and backsplash installed but it is getting there!
If you have not seen Part 1 of our Kitchen Transformation click  HERE.  You can also see our  video constructions updates for a more in-depth, up close and personal look at everything, including the lessons we learned along the way.
So, the was the first piece of quartz installed. Sorry for the poor lighting, they still had not installed all the lights at this point. Also, outside the kitchen window is a temporary storage shed that will be moved, once we can move our stuff back in.
We need to get the crown molding installed on top of the cabinets and most of the interior cabinet lighting as well as the under cabinet and upper cabinet lighting. The cabinets still need to be aligned and the hardware installed. My biggest problem is, I cannot find a backsplash tile I like. Hope to do that this weekend. We have some more work to do but we have come a long way.
Love the extra pantry we added on the side of the fridge.
Resources for this project:
See all materials
Any price and availability information displayed on [relevant Amazon Site(s), as applicable] at the time of purchase will apply to the purchase of this product.
Hometalk may collect a small share of sales from the links on this page.More info
Carolyn Matri Kavarnos
Want more details about this and other DIY projects? Check out my blog post!