Custom tile shower.


This was a 48" fiberglass shower to start out.
This is the old fiberglass shower to be replaced with a custom tile shower.
This is the old fiberglass shower to be replaced with a custom tile shower.
Old shower demoed
Old shower demoed
New framing complete,hanging durock cement board.
New framing complete,hanging durock cement board.
New hand held shower control valve roughed in,This controls hand held by the seat only, The regular shower valve is still in same location.
New hand held shower control valve roughed in,This controls hand held by the seat only, The regular shower valve is still in same location.
Tile and trim around shower valve complete.
Tile and trim around shower valve complete.
This is the hand held by the seat on an adjustable slide bar.
This is the hand held by the seat on an adjustable slide bar.
Corner shelves installed.
Corner shelves installed.
Shower done waiting on glass installation,will post photos when in.
Shower done waiting on glass installation,will post photos when in.
Granite seat installed.
Granite seat installed.

Have a question about this project?

Join the conversation

2 of 7 comments
Your comment...