Back deck remodel

KMS Woodworks
by KMS Woodworks
A project for a client a few months in the works...this is the joy of juggling many clients and projects.
The old back yard deck was rotted and on its last legs. The stairs and small deck up at the door were also in a sad state.
the owner wanted a lower maintenance option for the main lower deck. So we installed some flagstone. After the old deck was removed a "frame" was built using 6" landscape timbers. This area was then leveled with about 8000 pounds of crusher fines and then 4000 pounds of flagstone was installed...then the deck and stairs were rebuilt.
The stair treads, upper rails and decking is all Ipe...my Favorite
old deck removed...old stairs pictured above
deck removal begins...note the rot in the rim joists
4000 pounds of flagstone set
load after load of crusher fines
Ipe in all of its glory
complete new stringers tread and rails...1 st coat of paint on
from the patio side...just waiting a bit more for the PT stringers to dry before painting
deck demo in process
KMS Woodworks
Want more details about this and other DIY projects? Check out my blog post!