Almost 2 weeks later, does this look like a normal concrete pour?
So it's a sealer, I get that. But it looks so splattery! The contractor says this is part of the curing process and it should take a few weeks to get better. It's not. It looks exactly the same as the first day they poured it. It was PERFECT until they sprayed this stuff on it. Should we wait a few more weeks or do something?
Related Discussions
Vinyl plank flooring vs pergo (laminate)
I currently have stinky dirty carpeting in my living room and I want to replace it with a durable flooring that can stand up to dogs and kids.
How to remove popcorn ceiling that has been painted?
Does having a paint over a popcorn ceiling change how I'd remove the popcorn ceiling?
How to apply peel and stick wallpaper?
I want to spruce up my walls with peel-and-stick wallpaper. Has anyone used this before and can advise me as to how to apply it properly?
How to stain wood floor?
I've heard staining is a good technique for updating floors. So how do I stain my wood floor?
How do i get rid ofthese green spots and paint the wall so they dont ?
The wall outside my basement looks horrible and I want to paint it and make it look better. What do I do?
Change color of my shutters on my house to a diff color.?
Want to change color of my black shutters with out having to spend alot or poss buy new ones.. Also how do remove shutters ??? Thanks to all ,
I would call the contractor back again to have a look.
I agree I would also call the contractor back to double check it. Maybe they can do another layer of sealer and that would take care of the streaks.
I'm bummed. I asked, and he said oh that's normal and I just have to let it cure. I can't make him do anything, and I have no idea how to fix it. In just about a month we are having our families over for Thanksgiving and this is the walkway in front of our house. My husband thinks we can lay our own sealant with a paint roller, but I'm afraid of messing it up even more.
Call the contractor and ask what kind of sealer he used. Could be the wrong type of sealer and/or it was too soon.
https://www.foundationarmor.com/articles/how-long-do-you-have-to-wait-to-seal-concrete/
https://www.concretenetwork.com/concrete/maintaining/sealingplain.htm
Hi Tricia, its difficult to assess the issue from your picture but I did locate an article that might be of interest to you. It may help you deal with the contractor who needs to remedy or address your disatisfaction with the result of their work.
https://www.euclidchemical.com/company/blog/archive/diagnosing-5-common-concrete-sealer-problems/
Did he say how long it will take for it to be cured? I wonder too if they used an incorrect type of sealer on there
Like Annie I would also like to know how long the contractor said this would take to cure. Just to be positive I goggled it and found it should cure (minus the sealer) within 7 days but is doesn't reach its full strength until almost 4 weeks.
How long ago was this poured?
Hi, so the contractor is now unresponsive. He said it'd take a few weeks to cure when I last spoke with him. He laid it 2 weeks ago. This guy has clearly been doing this for quite some time given all the reviews. I'm really surprised at how he's acting now. I'd be surprised to hear he used the wrong kind or too soon as he does concrete all the time (a ton of reviews). So I just don't know.
You could get another concrete contractor and see if they can check out the job or even look at your photos and maybe suggest a remedy or solution. They should be able to do this for free.
Bring over other professional contractors and pick their brains, the more opinions the better, document your findings.
Ok, I'll try to do that. I'm upset about it but can't expend more energy on it now.
How humid is it where you are? If it's still pretty humid, it may take longer to cure and dry. I would keep asking the contractor direct questions on how long it takes. Also research concrete pours in this DIY forum b/c I feel like I've seen a similar question pop up.
Hi everyone. The contractor called me back. I guess I'm just impatient. He said that they used max cure, a cure/seal combo. He also said it takes 28 days to clear up and that the concrete color would clear up. I live in Colorado, so it's cold one day, hot the next. Seriously, we had 80 degree days and then today high of 50. So temps are up and down and it's really dry here.
ITs hard to see, it looks even to me.
Yeah, it's not the evenness of the concrete but the splatter pattern of the sealant they laid.
Hello, great suggestion! I've texted, and do have responses. I'll take a picture every few days.
It appears the sealant is capturing moisture inside the concrete. It seems to me that it was applied to early and should have been after the concrete had complete cured. I would definitely have an issue with this.
Call the folk back that laid the drive and tell them your concerns.
Hi, you guys might have missed my update. Repasting it below. Also, strange but the sealant is definitely changing, it's like the splatter is no longer splatter. Strange. I'll post a pic in a day or two:
***
Hi everyone. The contractor called me back. I guess I'm just impatient. He said that they used max cure, a cure/seal combo. He also said it takes 28 days to clear up and that the concrete color would clear up. I live in Colorado, so it's cold one day, hot the next. Seriously, we had 80 degree days and then today high of 50. So temps are up and down and it's really dry here.
Folks, Please read the entire thread before commenting, as the poster has since added updated information.
Well hopefully your contractor knows what he is doing and used the proper product. Thanks for the updates, I hope it works out for you.
Thank you Dee. I'm hopeful, I really am.
Sure hope your distressing situation self resolves.
Glad your contractor is communicating!
Going through situations like this can give you headaches and ulcers…I know this from personal experience…..fingers crossed for positive outcome!
I think it will stay like that
i would for sure contact those that poured it