Goodbye Hollywood Lights

Clear Choice Remodeling
by Clear Choice Remodeling
$27000
6 Weeks
Medium
Goodbye Hollywood lights. We removed the tub and removed the water closet door from the front and put in a pocket door on the left to allow room to enlarge the closet and shower.
With shampoo niche's in the shower and new cabinets with a tower and bottle pull outs, there is plenty of space to store toiletries out of the way, so the bathroom always looks clean and spacious.
Great flow of design and functionality.
New vanity lighting adds a softer look. Look at the new cabinets...they are custom built. The vanity tower adds more storage space where before it was wasted.
Before
Hollywood Lights a-blazin'.
Open walk-in shower. Sh
We put the water control in the entryway of most of our walk-in open showers to give more control of water upon entering. Check out the corner seating. There is also a shampoo niche behind that wall.
Before
What a difference!
Shampoo Niche
No more shampoo, conditioner, and body wash bottles on the floor. These niches area a great addition.
After with the side pocket door
Before
Frequently asked questions
Have a question about this project?
Comments
Join the conversation
2 of 30 comments
Next