MASTER BEDROOM CLOSET REVEAL

by Linda @ Home is Where My Heart is
(IC: blogger)
10 Materials
$1500
2 Weeks
Medium
Our closet was a disorganized mess! It was a contractor grade wire shelving, collect-all, dingy room that I hated walking into every day. So we emptied everything out, took down the wire shelving, patched and sanded a whole lot of holes, ripped up the carpet, painted the walls a cheery yellow, laid engineered bamboo flooring and then proceeded to hang black pipe and wood shelving to have an organized, beautiful master closet. You can read all about it at http://www.lindahomeiswheremyheartis.com/2017/10/master-closet-reveal-organized-clean-beautiful.html
This is a before picture of our master closet. Please don't judge!!
Walls painted, flooring laid.
The first side of the closet, we hung black pipe shelving to hang our clothes. We have one wooden shelf on the top. You can read all about the process here: http://www.lindahomeiswheremyheartis.com/2017/08/closet-renovation-pipe-shelving.html
The second side, we hung black piping and shelves to hold storage bins. You can read all about the process here: http://www.lindahomeiswheremyheartis.com/2017/10/closet-renovation-take-two.html
The back wall is for my shoes. You can read all about the process here: http://www.lindahomeiswheremyheartis.com/2017/10/closet-renovation-take-three-the-shoes.html
We also built a small PVC piping box that I painted black to hold large rolls of wrapping paper and fabric.
Here is the after with everything put back into its place. I love how it turned out..very organized, clean and pretty! You can read the reveal here: http://www.lindahomeiswheremyheartis.com/2017/10/master-closet-reveal-organized-clean-beautiful.html
And who doesn't love a 'Before & After'.
Enjoyed the project?
Suggested materials:
- 1/2" PVC piping (Lowes)
- 1/2" PVC tees and connectors (Lowes)
- 1/2" black iron pipe (Lowes, Home Depot)
- Edge glued panels (Lowes)
- 1x12x6' pine boards (Lowes)
- 1/2" iron elbows, tees, flanges, nipples, caps (Lowes, Home Depot)
- Wood conditioner, stain, polyurethane (Lowes)
- Engineered bamboo flooring (Lumber Liquidators)
- 1/2" PVC piping (Lowes)
- 1/2" PVC tees and connectors (Lowes)

Want more details about this and other DIY projects? Check out my blog post!
Published October 31st, 2017 9:27 PM
Frequently asked questions
Have a question about this project?