New Wooden Outdoor Deck
by
Brandon K
(IC: )
Enjoyed the project?
Published May 18th, 2011 9:03 AM
Comments
Join the conversation
2 of 6 comments
-
Level One Construction Co., LLC on May 19, 2011We recommend you let your deck dry for a minimum of four weeks after construction before we apply a penetrating sealer. The problem with new wood is that the grains are closed and the wood still contains natural chemicals called tannins and mill glaze. If left to nature, it would take 3-6 months for the grain to open and the natural chemicals to leach out. By using a combination of powerwashing and mill glaze remover, we can speed up this process. "One Time Wood Protector" is a good product.
-
-