More Bathroom Renovation Photos.

Meyndert Borrie Bornman
by Meyndert Borrie Bornman
This Bathroom needed a 200mm floor lift and and a door to be bricked up and a new door to be fitted, while still being used.
New shower floor tiling and grouting done.
Stone cover to hide new plumbing on the surface of the wall and 100mm shelve to finish top and accommodate a pull out and retractable hand shower above seat in bath.
Some stone work to frame the original mis aligned tiling.
wide photo showing finished tiling and swivel towel rails at shower side and basin hand towel and wash cloth rails.
After 37 years without drawers new drawer pine skeleton, smaller than cavities to accommodate basin.
Drawers in closed position to show filler pieces fitted on sides for basin.
Reclaimed Oak panels assembled and installed on drawer skeleton. Drawer on right side next to the toilet will hold the spare toilet rolls and I also fitted the dispenser into the drawer face..
Now just the painting by my wife, and some minor filling and Grouting finishing to complete the project. Total for project $700.00 or SAR 7000.00. Own labor.