1.4K Views
fixing a prior remodel
by
JD Kitchens Design Build Group
(IC: professional)
We first need to fix all of the thing the prior contractor had done. The shower had standing water and mold in it under the seat. the over sized step was to big for the room and not needed. The goal was to change the direction of the tile to lengthen the room, get rid of the step, round the tub front to add the appearance that the room is larger then it really is. And fix the shower, clean up the standing water, added Niches and create a better flow of water around the drain. The best part is we were able to get two small granite with a unique flow to it and use them for the vanity's. The few things to changes to the layout certainly gave us the room we were looking for and adding a warm tone on the walls and new lighting all came to together for a really nice bathroom.
Enjoyed the project?
Published December 7th, 2012 2:32 PM
Comments
Join the conversation
2 of 4 comments
-
Margie*Lee on Dec 07, 2013Very nice!!!
-
-
Les Mitchell on Oct 14, 2016EZshowerbase.com has very DIY friendly shower bases. Beautiful work!
-
Frequently asked questions
Have a question about this project?